Development of the Senegal river

Manantalie Energy board (SOGEM), Senegal High voltage transmission line

Manantalie Energy board (SOGEM), Senegal High voltage transmission line

  • EMPLACEMENTMatam-Dagana-Rosso, Sénégal, Mauritanie, Afrique
  • VALEUR
    DU CONTRAT
    33 000 000 $ CA
  • DURÉE12 months
  • FIN DES TRAVAUXDecember 2001

Development of the Senegal river.

Description

Conception, engineering, airborne topography, land survey, supply, fabrication, transportation and installation of 309 kilometers of high voltage electric line (225,000 volts) with optical fiber ground wire.