Development of the Senegal river

Manantalie Energy board (SOGEM), Mauritanie High voltage transmission line

Manantalie Energy board (SOGEM), Mauritanie High voltage transmission line

  • EMPLACEMENTRosso-Nouakchott, Mauritanie, Afrique
  • VALEUR
    DU CONTRAT
    18 000 000 $ CA
  • DURÉE10 months
  • FIN DES TRAVAUXApril 2002

Development of the Senegal river

Description

Desing, engineering, airborne topography, land survey, supply, fabrication, transportation and installation of 191 kilometers of high voltage electric line (225,000 volts) with optical fiber ground wire.