Construction of adjoining galleries between the powerhouse

Hydro-Québec, La Tuque Power plant

Hydro-Québec, La Tuque Power plant

  • EMPLACEMENTLa Tuque, Québec, Canada
  • VALEUR
    DU CONTRAT
    7 000 000 $ CA
  • DURÉE18 months
  • FIN DES TRAVAUXDecember 2008

Construction of adjoining galleries between the powerhouse and the dam as well as the modernization of the existing powerhouse comprising 6 turbine-alternator groups for a total of 224 MW.

Description

Cabling and hook-up of the 5 kV and 600 volts distribution switchgear from the groups to the outdoor switchyard. Control and protection, new protection and control rooms. Electricity and ventilation building services (equipments supplied by Hydro-Québec).